top of page
Trabalhadora da construção

MOR2 2ED-1.5X1.5

MCK Welding is a company specialized in robotic welding processes. As an expert in the field, it has developed compact, efficient, economical welding cells with the best cost-benefit ratio on the market, which provide a significant improvement in the quality of welding processes and greater flexibility of the weld bead.

As an example of a high-performance cell, the MOR2 2ED 1X1 is capable of welding parts up to 1000mm, which require orbital rotation, with two work stations and automatic or manual doors.

MOR2 2ED-1.5X1.5 1.jpg
Guarantee.png

Resources

  • Suitable for parts with a maximum dimension of 1000x1000 mm that do not require rotation;

  • Optimized robot workspace;

  • Reduced dimensions to occupy a smaller factory area;

  • Quick device exchange system;

  • Single base for easy installation and movement;

  • Cell-integrated security systems;

  • Uses high-quality components that provide low maintenance;

  • Uses robot and power supply from the same manufacturer for perfect communication and synchronization;

Cell composition

  • Estun Robot: ER8-1450

  • Welding Source Estun: EC 350

  • Estun Torch: ERG500

  • Robot pedestal

  • Two workstations with 2 automatic or manual doors

  • Monoblock base

  • Protective enclosure in steel sheet

  • Maintenance door

  • Visual signaling

MOR2 2ED-1.5X1.5 2.jpg

Technical Specifications

MOR2 2ED-1.5X1.5 Table .jpg
MOR2 2ED-1.5X1.5 4.jpg
MOR2 2ED-1.5X1.5 3.jpg
MOR2 2ED-1.5X1.5 5.jpg
MOR2 2ED-1.5X1.5 7.jpg
MOR2 2ED-1.5X1.5   8.jpg
Test.jpg
BNDES - logo.png
Test 2.jpg
Finame - Logo.jpg

MCK Welding 's robotic cell solutions can be developed according to the Customer's specifications and needs, using any brand of industrial robot and welding source.

Logo estun.png
Motoman.jpg
Kuka Logo.png
Fanuc Logo.png
Logo ABB_edited.png
Lincoln.jpg
ESAB.jpg
Miler.jpg
Fronius logo.png
Logo Megmeet.png

Services Included:

  • Issuance of the NR-12 safety risk report and ART;

  • Cell installation and operational training at the customer's plant2;

  • 40 hours of robot programming2.

Notes:

1. Transportation of the cell to the customer's plant not included.

2. Travel expenses (travel, food and accommodation) not included .

MOR2 2ED-1.5X1.5   9.jpg
Budget_image.png
bottom of page